Stage 1: Clearing the site

Clearing the site - Schematic drawing
 
Clearing the site
  1. Strip the site to a depth of about 2 m.
  2. Clear obstructions, remove potentially contaminated material and expose alluvium.
  3. Level the ground to the underside of the ground floor slab.
  4. Place the granular piling carpet.