Stage 3: Installation of bored piles
-
Trim the top of the sheet piles.
-
Install 600 mm diameter reinforced concrete bored piles with cast-in steel
columns.
-
Vibrate casing to toe into the sandstone.
-
Auger out pile socket into the sandstone.
-
Insert reinforcement cage and place concrete by tremie to basement level.
-
Partly oscillate (vibrate) out casing to almost level with the top of the
concrete pile.
-
Plunge steel column into wet concrete.
-
Backfill with fine granular material after concrete has set.
-
Remove casing completely.