Stage 6: Casting of intermediate level slab
-
Backfill the external excavation upto the ground level slab.
-
Lay blinding, formwork and bond breaker.
-
Seal/weld sheet pile clutches to prevent ingress of water, as they are
exposed.
-
Weld steel connections for the slab to the sheet pile wall and the cast-in
steel columns.
-
Reinforce and cast intermediate level slab to 5.3 m.