Stage 5: Excavation underneath the ground level slab
-
Use the openings left in the ground level slab to excavate down to formation
level (4.7 m) for the intermediate slab.
-
Commence pumping from dewatering wells.
-
Move plant into the excavation and continue under the ground level slab.
-
Place granular carpet over the alluvium in preparation for the pouring
of the intermediate slab.
-
Provide ventilation under the slab.
-